America's Sunlight Bullet Expressway

TRIPLE T Network, Transcontinential Transportation & Transmission Network

Home     U.S. ENERGY Objectives     2009 ENERGY SUMMIT PICS     ELECTRIFIED VEHICLES     MAG LEV     CLEAN CITIES COALITION     WATER, DROUGHT, LAKE MEAD     (ACV) HoverCraft      
U.S. Energy Secretary Steven Chu  7-30-09
Alternative Energy Solutions for Transportation
DOE Loan Guarantee Solicitation in Sec1703, 1705                            

Steven Chu’s  Proposed Objectives

Road and rail systems

 

 

A. ASBE

B. Desert Exp

C.  Mag Lev         

D.  AVT 

E.  Hwy 15  

                                                                                      A         B         C         D         E

Incentives to create jobs                                           _Y _     _Y_      _Y_      _Y_      _Y_

                                   

Spur development of Innovative clean energy         _Y_      _N_     _N_     _N_     _N_

technology that is smart, strong and secure

 

A grid that will deliver renewable power                  _Y_      _N_     _N_     _N_     _N_

more effectively and reliable

 

Goal of doubling renewable energy                          _Y_      _N_     _N_     _N_     _N_

generation in three years.

 

Need to accelerate renewable project                      _Y_      _Y_      _Y_      _Y_      _Y_

development, by ensuring access to capital

 

A grid that can move clean energy from                   _Y_      _N_     _N_     _N_     _N_

where it’s produced to where it can be used,

 

Systems that can integrate variable sources            _Y_      _N_     _N_     _N_     _N_

of power like wind and solar

 

Rapid disbursement of funds to stimulate                _Y_      _N_     _N_     _N_     _N_

the economy that favor transmission projects         

 

Most shovel ready projects                                       _Y_      _NO    _NO    _NO    _Y_

 

Complexity of transmission,

Planning and permitting                                             NO_    _Y_      _Y_      _Y_      _NA

                                                                 Score    10/10   3/10     3/10     3/10     3/10

 

 

Size and Scope of Projects

Pilot   Mileage   Property     Environmental          Costs      Total         Estimated          Time       1st Income

            miles   Goals    Acquisition    Considerations     per mile      costs         new jobs         to build      Generation

 

A. ASBE             300     3000         none            nominal              15 Mil      210 Bil      15,000/1.5Mil       three      6 months

B. Desert Exp      30       200       extensive    extensive             30 Mil          6 Bil        2,500/10,000       three       3 years

C.  Mag Lev        30       300       extensive     extensive             45 Mil        13.5 Bil     2,500/15,000       five         5 years
D.  AVT             600 ft.      ?        extensive     extensive         unknown     unknown         unknown          twenty         ?

E.  Hwy 15           15                       none              none              16.4 Mil      246.5 Mil    1,500 est.            three        none

 

What makes ASBE different, Is that it takes advantage of the unused portion of most major highways, the meridian. allowing the creation of two new lanes of road travel, under the umbrella of the overhead rail system, additionally providing the infrastructure for the transmission lines just below the rail platform, at the same time the infrastructure above the tracks for wind and solar. The renewable energy will be used at the point of generation with excess fed into the grid.  The Grid provides the back up, with additional stand by, with our mobile sub stations. This shovel ready project will begin 12-21-09.  As part of National Emergency Security System our substations can be moved to regions affected by natural disasters or terrorism without disruption to the main system.  The estimated 1.5 million direct work force is not just a regional opportunity, its national, we do not count the hundreds thousands of people employed in manufacturing of electric trains, electric cars, the building material, heavy equipment, transport and electrical supply’s and suppliers   While the cost may seem high at 210 billion, its all going into America’s economy, but in fact will be financed in very unique ways.  Everything involved can not and will not be divulged at this time.

 

The Triple T network is the driving force for ASBE and the American Energy Revolution 

Saturday August 8th 2009        Lou Baker Co-ordinator